This RFP is currently open for proposals.
Sign up for an account to get RFPs matching your business in your inbox.
7th Street Metro Center Traction Power Substation (TPSS) Replacement
8/12/2025
-
Los Angeles, CA
Metro
Buyer is seeking a full-service A/E and/or General Contractor to handle the replacement of the 7th Street Metro Center Traction Power Substation. The project involves removing the existing unit and installing a new TPSS at the Los Angeles metro station. The work requires coordination with transit operations and adherence to electrical safety standards.
- 7/1/2025 - Issue Date
- 7/8/2025 - Pre-Proposal Conference
- 7/15/2025 - Site Visit
- 8/12/2025 - Proposal Due Date
Refer to RFP
- Remove existing traction power substation unit
- Install new traction power substation
- Coordinate power transition planning during replacement
- Provide electrical engineering services for TPSS
- Develop site-specific installation plans
- Manage electrical system integration
- Coordinate with transit operations during implementation
- Perform TPSS commissioning and testing
- Provide documentation for new power systems
- Ensure compliance with transit electrical safety standards