This RFP is currently open for proposals.
Sign up for an account to get RFPs matching your business in your inbox.

Campus Energy Master Plan

7/25/2025
-
El Paso, Texas

University of Texas at El Paso

Buyer is soliciting proposals from qualified vendors to assess the existing campus electrical grid. The project requires identifying the optimal mix of energy generation and storage solutions. Vendor must deliver a comprehensive 15-year energy master plan. The plan should focus on energy efficiency, conservation, and resilience for the campus.

  • 6/27/2025 - Issue Date
  • 7/9/2025 - Pre-Proposal Conference
  • 7/9/2025 - Site Visit
  • 7/16/2025 - Question Cut Off Date
  • 7/25/2025 - Proposal Due Date
Refer to RFP
  • Assess existing campus electrical grid infrastructure and capacity
  • Identify optimal mix of energy generation and storage solutions
  • Develop 15-year energy master plan with implementation timeline
  • Analyze energy efficiency and conservation opportunities
  • Design resilience strategies for campus energy systems
  • Evaluate renewable energy integration potential
  • Conduct energy consumption and demand analysis
  • Perform cost-benefit analysis of proposed solutions
  • Create energy management recommendations and best practices
  • Develop sustainable energy transition roadmap
Odo - Campus Energy Master Plan