This RFP is currently open for proposals.
Sign up for an account to get RFPs matching your business in your inbox.
A&E Services for Full HVAC Replacement for Medium Security Housing Units
7/24/2025
-
Cranston, Rhode Island
State of Rhode Island Department of Corrections
Buyer seeks architectural and engineering services to replace the existing HVAC systems in six medium security housing buildings. The current 30-year-old HVAC system is served by central air handling units with campus steam and local steam absorption chillers. Buyer requires a design that prioritizes high efficiency and resiliency. The project includes mechanical, electrical, plumbing, and potentially site/civil and structural design services.
- 6/25/2025 - Vendor Q&A Start Date
- 7/2/2025 - Pre-Bid Conference
- 7/10/2025 - Vendor Q&A End Date
- 7/24/2025 - Proposal Due Date
- Must be a Professional Engineer/Architect licensed in Rhode Island
- Each discipline must have licensed engineer/architect overseeing design work
- Design replacement HVAC systems for six medium security housing buildings totaling 90,000 square feet
- Coordinate with utilities to secure all available rebates and incentives
- Create 3D models of mechanical rooms using scanning technology
- Develop constructability approach and phasing plan
- Perform code evaluation and ensure compliance with all applicable standards
- Validate existing electrical infrastructure and potential service upgrade requirements
- Conduct site assessment of existing equipment and services
- Provide complete CSI format specifications for all disciplines
- Attend weekly project meetings with DOC team throughout design phase
- Prepare design drawings in Revit 2024 with minimum LOD 300