Construction Management and Inspection Services for West Las Positas Boulevard Multimodel Reconstruction Project
7/23/2025
$34-$35.5 million total project cost with construction contract estimated at $27-$28 million
Pleasanton, CA
City of Pleasanton
Buyer seeks construction management and inspection services for the West Las Positas Boulevard Multimodal Reconstruction Project. The project converts three lanes of traffic to two lanes in both directions with a protected Class IV cycle track buffered by landscaped bio-detention. It includes reconstructing and stabilizing the existing roadway section to a depth of 42 inches, reconstructing landscape median, modifying traffic signals and lighting, and replacing damaged wet utilities. The construction duration is estimated to be between 300 to 350 working days.
- 7/16/2025 - Last date for Questions
- 7/23/2025 - Proposal Due Date
- 8/11/2025 - Oral Interviews
- 9/16/2025 - City Council Award
- 8/1/2026 - Construction Start
- 11/30/2027 - Construction Completion
- Construction manager must be licensed State of California civil engineer
- Minimum of three similar projects within past seven years
- Experience with Caltrans standards and procedures
- Provide constructability review of 100% PS&E prior to bidding
- Perform resident engineer functions per Caltrans specifications
- Manage and coordinate material testing and construction survey
- Monitor contractor's performance and enforce contract requirements
- Conduct project meetings and distribute meeting minutes
- Review and monitor construction schedule
- Document construction progress with photos and reports
- Coordinate with utility companies and outside agencies
- Communicate with residents, tenants, and business owners
- Utilize virtual project management software for document tracking