Canaan Hill Culvert Upgrade Design Engineering Services

7/21/2025
-
Canaan, Vermont

Town of Canaan

Buyer seeks engineering services for the replacement of an undersized culvert at Canaan Hill Road/Fund Road intersection. The project aims to improve flood resiliency, prevent road washouts, reduce sedimentation, and improve aquatic organism passage. The existing 4-foot boiler tube culvert is undersized and regularly overtops during high water events. The new structure must be designed to VTrans Hydraulic Manual standards and address multiple site constraints.

  • 6/25/2025 - RFP Issued
  • 7/14/2025 - Question Deadline
  • 7/21/2025 - Proposal Due Date
  • Expertise in design, engineering and permitting of box culverts
  • Experience with flood resiliency projects
  • Registration with Vermont Secretary of State's Office
  • Insurance coverage per Specifications for Contractor Services
  • Design box culvert to meet VTrans Hydraulics Manual standards
  • Provide engineering services for culvert replacement at Canaan Hill/Fund Road intersection
  • Develop plans to maintain road access during construction
  • Address right-of-way impacts in the design process
  • Conduct permitting for the culvert replacement project
  • Follow VTrans Municipal Assistance Section (MAS) process
  • Ensure compliance with stream equilibrium and bankfull width standards
  • Design for improved flood resiliency to prevent future washouts
  • Design for reduced sedimentation of Keyer Brook
  • Design for improved aquatic organism passage
  • Provide construction oversight after engineering study completion
  • Create designs in VTrans CADD Manual/MicroStation format
  • Evaluate multiple culvert replacement options from hydraulic study
  • Design structure to handle increasingly frequent large stormwater events
  • Address ledge considerations in structure selection
  • Incorporate flared wingwalls and concrete headwalls in design
  • Design proper channel alignment with natural width
  • Implement erosion protection measures using appropriate stone fill
  • Coordinate with ANR River Management Engineer for compliance
  • Consider environmental impacts on B-1 rated waterway