Canaan Hill Culvert Upgrade Design Engineering Services
7/21/2025
-
Canaan, Vermont
Town of Canaan
Buyer seeks engineering services for the replacement of an undersized culvert at Canaan Hill Road/Fund Road intersection. The project aims to improve flood resiliency, prevent road washouts, reduce sedimentation, and improve aquatic organism passage. The existing 4-foot boiler tube culvert is undersized and regularly overtops during high water events. The new structure must be designed to VTrans Hydraulic Manual standards and address multiple site constraints.
- 6/25/2025 - RFP Issued
- 7/14/2025 - Question Deadline
- 7/21/2025 - Proposal Due Date
- Expertise in design, engineering and permitting of box culverts
- Experience with flood resiliency projects
- Registration with Vermont Secretary of State's Office
- Insurance coverage per Specifications for Contractor Services
- Design box culvert to meet VTrans Hydraulics Manual standards
- Provide engineering services for culvert replacement at Canaan Hill/Fund Road intersection
- Develop plans to maintain road access during construction
- Address right-of-way impacts in the design process
- Conduct permitting for the culvert replacement project
- Follow VTrans Municipal Assistance Section (MAS) process
- Ensure compliance with stream equilibrium and bankfull width standards
- Design for improved flood resiliency to prevent future washouts
- Design for reduced sedimentation of Keyer Brook
- Design for improved aquatic organism passage
- Provide construction oversight after engineering study completion
- Create designs in VTrans CADD Manual/MicroStation format
- Evaluate multiple culvert replacement options from hydraulic study
- Design structure to handle increasingly frequent large stormwater events
- Address ledge considerations in structure selection
- Incorporate flared wingwalls and concrete headwalls in design
- Design proper channel alignment with natural width
- Implement erosion protection measures using appropriate stone fill
- Coordinate with ANR River Management Engineer for compliance
- Consider environmental impacts on B-1 rated waterway