Design Services for Transmission Line and Substation
7/15/2025
-
Falls City, Nebraska
City of Falls City
Buyer seeks engineering services for 15 miles of 115 kV transmission line and a new 50 MVA substation. The project will establish a new interconnection point to the Southwest Power Pool via a 115 kV switchyard. Buyer requires expertise in high-voltage design, substation engineering, and project execution for municipal utility systems. The project is partially funded by the Nebraska Department of Economic Development and must comply with grant conditions.
- 6/17/2025 - RFQ Published
- 6/30/2025 - Questions Due
- 7/15/2025 - Proposal Due Date
- 12/31/2030 - Substantial Completion Estimated
- Licensed professional engineers in Nebraska and Kansas
- Experience in ROW acquisition and utility easement coordination
- High-voltage transmission line routing and design experience
- Substation engineering and equipment specification expertise
- Environmental permitting and regulatory compliance experience
- Construction management for utility-scale electrical infrastructure
- Evaluate transmission interconnect options (looped vs. radial feed)
- Assess potential substation locations
- Provide guidance for SPP and NITS processes
- Secure Network Integration Transmission Service Agreement
- Support right-of-way acquisition
- Create KMZ/KML or GIS-compatible shapefiles
- Ensure documentation meets Nebraska licensing standards
- Provide environmental consultants for permitting
- Evaluate constructability and recommend phasing strategies
- Align design milestones with grant administration