This RFP is currently open for proposals.
Sign up for an account to get RFPs matching your business in your inbox.

GBRA Pump Station No. 2 Canal Bank Stabilization

7/10/2025
-
Comal County, Texas

Guadalupe-Blanco River Authority

Buyer seeks professional engineering services for canal bank stabilization at Raw Water Pump Station No. 2. The project requires designing erosion control systems for areas upstream and downstream of the existing sheet pilings where canal bank erosion is occurring. Buyer requires geotechnical engineering expertise to develop construction documents for permanent bank repair and stabilization. The selected firm will complete design, permitting, and construction administration services.

  • 6/26/2025 - Question Submission Deadline
  • 7/10/2025 - Proposal Due Date
  • Experience in design of erosion control systems
  • Professional engineering firm expertise in bank stabilization
  • Geotechnical engineering capabilities
  • Ability to comply with proposed delivery schedule
  • Satisfactory record of performance and integrity
  • Analyze alternative bank stabilization methods
  • Design permanent erosion control systems
  • Prepare construction documents for bank repair
  • Conduct geotechnical engineering for sheet piling areas
  • Develop preliminary engineering report with design criteria
  • Perform field surveys and topographic mapping
  • Create 60% and 90% design plans and specifications
  • Assist with obtaining all required permits
  • Provide construction administration services
  • Prepare as-built record drawings

Want to Save Time Drafting Proposals?

We generate a proposal draft so you don’t have to start from scratch. Learn more how you can save up to 80% of your time writing proposals.

Book Demo
Odo - GBRA Pump Station No. 2 Canal Bank Stabilization