Johnson County Bridge 61 Rehabilitation Project
Johnson County Highway Department
Buyer seeks engineering services for rehabilitation of Bridge 61 on CR 575 W over South Prong Stotts Creek in Union Township. The existing bridge is a two-lane, single span structure with advanced deterioration in the superstructure and wearing surface. The project will replace the superstructure with new box beams and concrete deck. Scour protection and underpinning will address foundation issues. The project includes approximately 150 feet of approach work on each side.
- 6/5/2025 - Posting Date
- 7/1/2025 - Proposal Due Date
- Environmental Document Preparation - CE
- Topographical Survey Data Collection
- Non-Complex Roadway Design
- Level 1 Bridge Design
- Right of Way Plan Development
- Project Management for Acquisition Services
- Title Search
- Appraisal
- Appraisal Review
- Construction Inspection
- Replace existing box beam superstructure with new beams and concrete deck
- Install scour protection in front of abutments
- Underpin areas that have washed out
- Complete approximately 300 feet of approach roadway work
- Prepare CE environmental documentation
- Conduct ecological surveys
- Develop stream and wetland mitigation plans
- Obtain necessary waterway permits
- Perform bridge hydraulic design
- Develop right-of-way plans
- Perform topographical survey data collection
- Complete property appraisals and negotiations
- Coordinate utility relocation
- Prepare non-complex roadway design
- Provide construction inspection services
- Manage project within 80% Federal, 20% Local funding requirements
- Conduct title searches for affected properties
- Ensure compliance with 3% DBE participation goal
- Develop bridge design meeting load rating requirements
- Prepare cost containment strategies for limited budget