This RFP is currently open for proposals.
Sign up for an account to get RFPs matching your business in your inbox.

Chris Walsh Memorial Trail Designer

6/25/2025
-
Framingham, MA

City of Framingham

Buyer seeks MassDOT pre-qualified professional engineering firms to design the Chris Walsh Memorial Trail. The project involves creating a 1.3-mile accessible shared-use path along Farm Pond, connecting with the MWRA Sudbury Aqueduct, and developing a pedestrian bridge to connect to the MBTA commuter rail parking lot. Proposals must be submitted electronically through the City's Vendor Registry system.

  • 6/11/2025 - RFQ documents available
  • 6/25/2025 - Proposal Due Date
  • Must be MassDOT pre-qualified professional engineering firm
  • Design 1.3-mile accessible shared-use path along Farm Pond
  • Develop new pedestrian bridge to connect trail to MBTA parking lot
  • Connect trail with portions of MWRA Sudbury Aqueduct
  • Provide preliminary and final design engineering services
  • Create accessible trail specifications meeting ADA requirements
  • Develop construction documents for bidding and implementation
  • Coordinate with MBTA regarding commuter rail parking lot connection
  • Design trail features that memorialize Chris Walsh appropriately
  • Incorporate environmental considerations for construction near Farm Pond
  • Ensure trail meets MassDOT standards and specifications

Want to Save Time Drafting Proposals?

We generate a proposal draft so you don’t have to start from scratch. Learn more how you can save up to 80% of your time writing proposals.

Book Demo
Odo - Chris Walsh Memorial Trail Designer