Pueblo South Parking Lots Budgets

6/16/2025
$1,119,301.25
Pueblo, CO

Martin Marietta Materials Inc

Buyer seeks contractor for renovation of parking lots at Pueblo South High School. The project encompasses two main areas: faculty lot requiring asphalt repair and restriping, and student parking requiring complete removal and replacement. Work includes asphalt removal, subgrade preparation, base installation, and surface paving. Price validity extends through July 31, 2025, after which liquid asphalt cement price increases may apply.

  • 6/16/2025 - Proposal Due Date
  • 7/31/2025 - Price validity end date
Refer to RFP
  • Remove and replace 736 SF of failed asphalt
  • Mill and overlay at 2-inch depth
  • Restripe faculty lot (18,550 SF)
  • Remove existing asphalt and base to 10-inch depth
  • Recompact subgrade in student parking areas
  • Place and compact 6-inch aggregate base
  • Install 4-inch asphalt surface in student areas
  • Restripe student parking, drop-off lane, and service drive
  • Complete drainage work (where slopes exceed 2%)
  • Validate customer credit before commencing work