Holliston Sidewalk Curb Ramp Installation
5/16/2025
-
Holliston, MA
Town of Holliston Department of Public Works - Highway
Buyer seeks a contractor to install forty new sidewalk curb ramps throughout the Town of Holliston. The project includes adjusting 360 feet of granite and concrete curbing, installing cast iron detectable warning pads, and ensuring all ramps meet ADA compliance. Contractor must complete all work before August 30, 2025 when the school year begins. Successful bidder must be MassDOT prequalified and provide a 50% payment bond.
- 5/9/2025 - Questions Due
- 5/16/2025 - Proposal Due Date
- 8/30/2025 - Project Completion Deadline
- MassDOT Prequalification required
- OSHA 10-hour construction safety certification for all employees
- Minimum three similar references from past five years
- Install 40 new ADA-compliant sidewalk curb ramps throughout town
- Adjust 360 feet of granite and concrete curbing
- Install cast iron Duralast detectable warning pads in all ramps
- Ensure all curb ramps are minimum six inches thick cement concrete
- Place asphalt to meet curb ramps, existing sidewalk and street
- Compact gravel with minimum 6,000 pounds of compaction force
- Provide traffic control signage and coordinate police detail/flagger
- Apply loam and seed where needed around curb ramps
- Compact bituminous concrete with minimum 2-ton vibratory roller
- Complete all work before school year starts (August 30, 2025)