This RFP is currently open for proposals.
Sign up for an account to get RFPs matching your business in your inbox.
Possum Kingdom Geotechnical Services
5/13/2025
-
Waco, Texas
Brazos River Authority
Buyer requires geotechnical engineering services at Morris Sheppard Dam. Morris Sheppard Dam was designed by Ambursen Engineering Corporation and constructed in 1941 to form the Possum Kingdom Lake Reservoir. The dam is located in Palo Pinto County, approximately 25 miles northwest of Mineral Wells, Texas. Services include monitoring instrumentation, performing safety inspections, and providing geotechnical consultation.
- 5/2/2025 - Last date to ask questions
- 5/6/2025 - Post response to questions
- 5/13/2025 - Proposal Due Date
- Professional engineering license applicable to geotechnical services in Texas
- Review and assess dam monitoring instrument readings
- Provide video inspection and cleaning of instrumentation systems
- Perform dam safety inspections and prepare reports
- Read inclinometers, analyze results and prepare findings
- Survey and map geological surface features
- Conduct subsurface exploration with core borings and analysis
- Install monitoring instrumentation like seismometers and piezometers
- Manage and maintain instrumentation readings using Microsoft Excel
- Develop recommendations for instrumentation installations and replacements
- Retrofit existing instrumentation with automated reading equipment
Want to Save Time Drafting Proposals?
We generate a proposal draft so you don’t have to start from scratch. Learn more how you can save up to 80% of your time writing proposals.