This RFP is currently open for proposals.
Sign up for an account to get RFPs matching your business in your inbox.
Design Engineering Services and Construction Engineering Assistance for Lift Station #6
4/28/2025
-
Crystal Lake, IL
City of Crystal Lake
Buyer seeks a qualified consulting firm for design engineering services and construction engineering assistance for the reconstruction of Lift Station 6. The station is located in the right-of-way at Keith Avenue and Harold Street, serving a small tributary area north of US Route 14. Originally installed in 1957 with upgrades in the early 1970s, the dry pit lift station discharges to a gravity sanitary sewer system flowing to Wastewater Treatment Plant #2.
- 4/28/2025 - Proposal Due Date
Refer to RFP
- Design engineering services for reconstruction of Lift Station 6
- Construction engineering assistance during implementation phase
- Evaluate 65+ year old dry pit lift station infrastructure
- Design force main effluent discharge to gravity sanitary sewer
- Coordinate with existing wastewater treatment plant systems
- Develop plans for lift station located in right-of-way corner
- Address infrastructure dating back to 1957 with 1970s upgrades
- Plan integration with tributary area north of US Route 14
- Ensure compliance with wastewater engineering standards
- Provide technical specifications for pumping equipment replacement
Want to Save Time Drafting Proposals?
We generate a proposal draft so you don’t have to start from scratch. Learn more how you can save up to 80% of your time writing proposals.