Lyman Transmission Project Engineering Predesign Phase Services
City of Bozeman
Buyer seeks engineering services for predesign phase of the Lyman Transmission Rehabilitation Project. The project involves condition assessment of raw and potable water transmission mains, identifying strategic rehabilitation needs, and developing alternatives. Services include pipeline condition assessment, risk analysis, and recommendations for rehabilitation or replacement. Buyer aims to ensure continued reliable service of water transmission infrastructure dating back to the 1920s.
- 4/17/2025 - Deadline for Technical Questions
- 4/24/2025 - Proposal Due Date
- 5/9/2025 - City Evaluation of Proposal
- 5/16/2025 - Selection Decision
- 6/24/2025 - Contract Authorization
- Experience with current pipeline condition assessment practices and technologies
- Experience with potable and raw water pipeline rehabilitation
- Experience with potable and raw water pipeline replacement
- Experience with constructability analyses
- Experience with environmental permitting
- Experience with cost estimating
- Experience with complex municipal water transmission projects
- Perform pipeline condition assessment of raw and potable water transmission mains
- Develop progressive examination plan with data collection methodology
- Deploy and manage condition assessment technologies and services
- Analyze pipeline risk and rank distinct sections by priority
- Create condition assessment report with findings and monitoring recommendations
- Identify serviceability objectives for each transmission main
- Develop repair, rehabilitation, or replacement recommendations for distinct sections
- Prepare schematic layouts and conceptual design criteria
- Develop opinions of probable construction and design costs
- Identify permitting and regulatory requirements for each alternative
- Analyze constructability issues for recommended solutions
- Coordinate water system shutdowns with other city projects
- Perform risk analysis of pipeline sections for strategic rehabilitation
- Conduct environmental permitting assessments for river and creek crossings
- Manage access requirements on private and city-owned lands
- Develop discrete project alternatives for high-risk pipeline sections
- Coordinate with Lyman Reservoir project team as needed
- Create screening criteria for evaluating project alternatives
- Address unique challenges of asbestos concrete pipe assessment
- Develop construction phasing strategy that minimizes service disruptions