This RFP is currently open for proposals.
Sign up for an account to get RFPs matching your business in your inbox.

Construction Inspection and Material Testing Services for Eastside Road Bridge Over Olney Creek Project

3/28/2025
-
Redding, California

City of Redding

The buyer is soliciting proposals for construction inspection and materials testing services for the Eastside Road Bridge Over Olney Creek Project. The project involves building a new cast-in-place reinforced concrete slab bridge with two travel lanes, shoulders, and sidewalks. The work includes road approaches, concrete work, fencing, pipe removal, utility relocation, and waterline installation. The buyer needs a full-time inspector and materials testing firm to oversee the $4.4 million construction project.

  • 3/14/2025 - Deadline for Questions
  • 3/28/2025 - Proposal Due Date
  • 5/1/2025 - Begin Construction
  • 7/31/2026 - End Construction
Refer to RFP
  • Provide full-time construction inspection services
  • Perform materials testing duties
  • Attend regularly scheduled construction status meetings
  • Coordinate with Resident Engineer and Contractor
  • Review contract documents and plans
  • Perform labor compliance tasks
  • Track work quantities for progress payments
  • Assist with utility coordination
  • Review project submittals
  • Inspect traffic control measures

Want to Save Time Drafting Proposals?

We generate a proposal draft so you don’t have to start from scratch. Learn more how you can save up to 80% of your time writing proposals.

Book Demo