Engineering Services for Plumtree Lane Storm Sewer Improvement

3/18/2025
-
Midland, Michigan

City of Midland

The buyer seeks engineering design services for an ARPA-funded storm sewer improvement project. The project involves replacing 2,930 linear feet of undersized storm sewer along Plumtree Lane. The scope includes upsizing pipes, replacing manholes/catch basins, and reconstructing pavement and curbs. The buyer requires CAD drawings, permits, specifications, cost estimates, and design review meetings.

  • 3/18/2025 - Proposal Due Date
  • 9/1/2025 - EGLE Permit Submittal
  • 10/31/2025 - Final Deliverables
Refer to RFP
  • Provide survey and soil borings for design
  • Prepare CAD drawings using MicroStation
  • Obtain necessary permits from EGLE, MDOT, and County Drain Commissioner
  • Develop construction specifications and special provisions
  • Create detailed cost estimate and bid tab
  • Facilitate design review meetings with City
  • Submit EGLE permit by September 1, 2025 if needed
  • Deliver all final documents by October 31, 2025