This RFP is currently open for proposals.
Sign up for an account to get RFPs matching your business in your inbox.
IAQ Survey and Mold Remediation Services for Clifton T. Perkins Hospital Center
Clifton T. Perkins Hospital Center
Buyer seeks services for Indoor Air Quality (IAQ) survey, mold remediation, and building material replacement at its hospital campus. The scope includes surveying for mold and IAQ issues, conducting asbestos and lead sampling, performing mold remediation and cleanup, and replacing affected building materials. Buyer requires the contractor to follow industry standards and regulations for mold remediation in healthcare facilities. Work must be completed within 45-60 days after start.
- 1/23/2025 - Pre-Proposal Conference
- 1/30/2025 - Questions Due
- 2/7/2025 - Proposal Due Date
- Licensed in Maryland as a General Contractor
- Certified to perform Industrial Hygiene, IAQ, Mold Inspection, Remediation and Repair work
- Perform IAQ and mold survey of hospital buildings
- Conduct asbestos and lead sampling as needed
- Set up containment barriers and air filtration systems
- Remove and dispose of contaminated building materials
- Clean and treat salvageable surfaces
- Apply anti-microbial treatments and sealants
- Perform HVAC duct cleaning
- Conduct post-remediation testing and inspection
- Replace removed building materials
- Provide detailed documentation of all work performed
Want to Save Time Drafting Proposals?
We generate a proposal draft so you don’t have to start from scratch. Learn more how you can save up to 80% of your time writing proposals.